Bridge ahead         
No need to call the bridge tender today the old OshKosh Bidge Draw bridge Is locked and Lined forRail Traffic Because the River is frozzen over. Wont be long before we Will be calling the bridge to let Him know whee need it turned when summer gets back From the boat traffic.
Date: 1/16/1996 Location: Oshkosh, WI   Map Show Oshkosh on a rail map Views: 241 Collection Of:   Eric Kurowski
Author:  Eric Kurowski
Bridge ahead
Picture Categories: Bridge,Winter,InCab This picture is part of album:  Eric J Kurowski
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=1943732